Sprint tracking, without the spreadsheets

Track every sprint in real time.
Fix problems before retro.

SuperPM monitors sprint health across Linear, Jira, and GitHub. Get alerted when velocity drops, scope creeps, or tickets go stale — days before the deadline.

// Built by engineering leaders, for engineering leadersSOC 2 Type II5-min setup
Why sprints slip

Most sprint problems are discovered too late to fix

By the time a sprint is visibly off-track, the damage is already done. Stakeholders are surprised. Engineers are blamed. Roadmaps slip quietly.

[01] Late detection
73%

of sprint slips are first noticed within 48 hours of the deadline.

"We only realize a sprint is off-track when it's too late."
[02] Manual triage
5h

average weekly time managers spend manually checking ticket status across tools.

"I spend hours every week stitching ticket status across Linear, GitHub, and Slack."
[03] Burnout blind spot
1/3

of engineers say their manager didn't notice they were overloaded until it became a problem.

"I have no idea who's overloaded until someone burns out."
[04] Status theater
82%

of standups surface the wrong risks, or no risks at all, before sprint end.

"Our standup is status theater, nobody surfaces real risks."
Sprint tracking features

Automated sprint health monitoring that works from day one

SuperPM reads from the tools your team already uses. Zero adoption required from ICs. Sprint insights show up where managers actually look.

01Sprint Risk Alerts

Get alerted days before deadline, not in the retro

SuperPM detects stale tickets, scope creep, and velocity drops automatically. Routes to email, Slack, or wherever you already triage.

Sprint 47 trending 18% off committed delivery2d ago
SPM-481 stale 4 days · assigned M. Chen5h ago
Scope +3 tickets added mid-sprintyesterday
02Capacity Heatmap

See who's overloaded at a glance

Cross-references assigned tickets with calendar load.

MC
AP
RS
DP
03Weekly Report

Stakeholder-ready every Friday

Auto-generated. No more Sunday-night writing.

Sprint 47 · 62% complete
SPM-422 · shipped Wed
SPM-481 · risk, owner notified
Carry-over: 4 tickets
Cycle time ↑ 0.4d
04Blocker Detection

Surface the stuck work, automatically

PRs idling in review, dependencies at risk.

SPM-422PR review72h
SPM-481stale96h
SPM-503blocked byPLT-12
05Delivery Analytics

Cycle time, completion rate, estimation accuracy, and carry-over, per team and per engineer

Spot trends that explain why a team consistently misses or beats commitments. Backed by your live ticket data.

06Zero adoption tax

Plug in once. Your engineers don't change a thing.

SuperPM is read-only on day one. No new fields, no time tracking, no extra meetings. ICs do their work, managers get the signal.

LinearJiraGitHubGitLabCalendarSlack
~

5-minute setup

OAuth your tools. We index in the background. First insights in under an hour.

Plugs into existing tools

No data lock-in. We read; we don't write. Your sources of truth stay where they are.

Zero adoption from ICs

Engineers don't install anything, fill in anything, or attend anything new.

How sprint tracking works

From connected tools to sprint alerts in three steps

STEP 01

Connect your tools

OAuth Linear, Jira, GitHub, GitLab, Slack, and Google Calendar. Read-only. nothing your engineers will notice.

LinearJiraGitHubGitLab
STEP 02

SuperPM analyzes signals

We continuously model sprint health from ticket movement, PR cycle time, scope changes, and calendar load, by team and by engineer.

Cycle timeScope creepStale tickets
STEP 03

You get alerts and reports

Risk alerts in Slack and email when sprints drift. A clean weekly summary every Friday, ready to ship to your VP.

SlackCalendarEmail
// Native integrations
LinearJiraGitHubGitLabGoogle CalendarSlack
Trusted by engineering leaders

Teams using SuperPM catch sprint risks 5 days earlier on average

5d
Earlier average risk detection
Across 240+ teams · v1.0 → v1.4 · n=1,820 sprints
−42%
Sprint slips
3.1h
Saved per manager / week
+18%
Estimation accuracy
"We used to find out about sprint slips on Friday morning. Now I get a Slack ping on Tuesday and we have time to actually do something about it."
EH
Elena Hwang
Engineering Manager · Lumera
"My weekly delivery report writes itself. That alone paid for the tool. I got my Sundays back."
MR
Marcus Reeves
VP Engineering · Northwind
"SuperPM caught two engineers heading into burnout territory before I did. The capacity heatmap is genuinely the most useful thing I look at."
SP
Sasha Petrov
Tech Lead · Polaris.io
Pricing

Try free for 14 days. Scale when you're ready.

Every plan includes a 14-day free trial. Upgrade when your team outgrows it, never before.

Starter

14-day trial

For small teams getting started with sprint visibility.

$59/ month$708 / yr · save $120
  • Up to 5 engineers tracked
  • 1 integration (Linear or Jira)
  • Sprint risk alerts via email
  • Weekly delivery summary
  • 30-day data retention
  • Community support

Scale

14-day trial

For orgs running multiple teams with advanced needs.

$199/ month$2,388 / yr · save $480
  • Unlimited engineers
  • Everything in Team, plus
  • Multi-team views & cross-team dependencies
  • Custom alert rules and thresholds
  • API access
  • SSO (SAML & OIDC)
  • Dedicated onboarding
  • Unlimited data retention
  • Custom integrations
  • SLA guarantee

Running engineering at scale? Let's talk.

Custom pricing, dedicated CSM, on-prem deployment, and contractual SLAs for 200+ engineer organizations.

On-premCustom SLAsDedicated CSMProcurement supportCustom DPA
Sprint Tracking FAQ

Common sprint tracking questions

What is sprint tracking software?
Sprint tracking software monitors the health and progress of your engineering sprints in real time. Unlike issue trackers that show individual ticket status, sprint tracking tools like SuperPM aggregate signals from tickets, PRs, calendars, and communication tools to tell you whether the sprint as a whole is on track, at risk, or off-track, before the deadline arrives.
How does SuperPM track sprint progress automatically?
SuperPM connects to your existing tools via read-only OAuth: Linear, Jira, GitHub, GitLab, Google Calendar, and Slack. It continuously monitors ticket movement, PR cycle time, scope changes, and calendar load. When a combination of signals suggests the sprint is drifting, it sends an alert to Slack or email. Your engineers never interact with SuperPM directly.
What sprint metrics does SuperPM monitor?
SuperPM tracks completion rate, velocity trends, scope creep (tickets added mid-sprint), cycle time per ticket, stale tickets (no movement in 48+ hours), carry-over risk, PR review bottlenecks, and calendar-aware capacity per engineer. These signals are combined into a single sprint health score updated in real time.
How early can SuperPM detect a sprint going off-track?
On average, SuperPM detects sprint risks 5 days before the deadline, compared to the typical discovery window of 24 to 48 hours. It does this by monitoring leading indicators like stale tickets and velocity drops rather than waiting for the progress bar to fall behind.
Does sprint tracking with SuperPM require engineers to change their workflow?
No. SuperPM is read-only on day one. It connects to the tools your team already uses and produces insights without asking engineers to log time, fill in custom fields, or attend new meetings. Zero adoption tax: your engineers work exactly as they do today.
Get started

Start tracking sprints in 5 minutes.

Connect your tools via OAuth. See your first sprint health alert today.